HCF Project Section This section is for extensive projects only. Please read the rules before posting.

croninc's ej8 build up thread

Thread Tools
 
Search this Thread
 
  #81  
Old 06-21-2009 | 11:37 PM
croninc's Avatar
Thread Starter
|
HCF Member
Joined: Feb 2008
Posts: 2,059
From: San Leandro, CA
Default

YESSSS turbo piping and intercooler + bov for $95 shipped, finally found the deal I was looking for. Prolly gunna order the ecu w/ chrome base map soon. Pics to come!
 
  #82  
Old 06-25-2009 | 01:31 AM
croninc's Avatar
Thread Starter
|
HCF Member
Joined: Feb 2008
Posts: 2,059
From: San Leandro, CA
Default

update: intercooler + piping will be here next wed. also the jerk off I bought injectors off still hasnt gotten them to me. He has the worst communication skills I have ever seen but atleast he left a number. I will give him a call sometime tomorrow. Also i will be lowering her down a little more and evening out all foursides before the alignment and new front tires.
 
  #83  
Old 06-27-2009 | 09:31 AM
Superfly's Avatar
HCF Member
Joined: Feb 2009
Posts: 1,380
From: Albuquerque, NM
Default

Where are the pics
 
  #84  
Old 06-30-2009 | 09:29 PM
croninc's Avatar
Thread Starter
|
HCF Member
Joined: Feb 2008
Posts: 2,059
From: San Leandro, CA
Default

Intercooler + piping came in today. I'll post pics later tonight.

Plans for tomorrow:

So I'm going to paint the old valve cover and trade with sfgiants. Next I plan on painting the downpipe flat black, the hot side of the turbo flat black. Also i want to paint the oil return flange the same blue as my valve cover. After that while everything dries I'm going to tweak the suspension a little bit and drop her a lil bit more. Once all that is done, CAR WASH TIME lol. Pics will follow everything.
 
  #85  
Old 06-30-2009 | 09:36 PM
jpnolan's Avatar
HCF Member
Joined: Aug 2007
Posts: 1,833
From: Miami, Florida
Default

Originally Posted by croninc
Intercooler + piping came in today. I'll post pics later tonight.
Its later tonight.... Lol. Looks good dude it looks like our projects are about to finish at the same time.
 
  #86  
Old 06-30-2009 | 09:56 PM
basbal123's Avatar
HCF Member
Joined: Sep 2006
Posts: 1,132
From: Bethany Beach, DE
Default

ya dont forget on this forum we use pics =]
 
  #87  
Old 06-30-2009 | 10:03 PM
sfazngiants's Avatar
HCF Member
Joined: Oct 2007
Posts: 3,199
From: NorCal
Default

pics of the goodies that came in today, and pics of the VC please.
 
  #88  
Old 06-30-2009 | 11:49 PM
croninc's Avatar
Thread Starter
|
HCF Member
Joined: Feb 2008
Posts: 2,059
From: San Leandro, CA
Default

Originally Posted by jpnolan
Its later tonight.... Lol. Looks good dude it looks like our projects are about to finish at the same time.
Yea it would be sick to get it done this summer. As long as I keep finding sweet deals everything will work out.

Originally Posted by basbal123
ya dont forget on this forum we use pics =]
Originally Posted by sfazngiants
pics of the goodies that came in today, and pics of the VC please.
yea yea yea yea yea yea, i kno im sorry. Too lazy. I'll do it tomorrow, wait it is tomorrow so sometime later today LOL. Today will be full of pictures I promise.
 
  #89  
Old 07-01-2009 | 11:29 PM
croninc's Avatar
Thread Starter
|
HCF Member
Joined: Feb 2008
Posts: 2,059
From: San Leandro, CA
Default

im so sorry for no pics...i did paint a little today. DUDE sfgianrts i primed the valve cover,. NAyways this is a drunk post so i hope it makes some sort fo eence.
 
  #90  
Old 07-01-2009 | 11:54 PM
sfazngiants's Avatar
HCF Member
Joined: Oct 2007
Posts: 3,199
From: NorCal
Default

that did not make sense, lol, post them pics up
 


Quick Reply: croninc's ej8 build up thread



All times are GMT -8. The time now is 07:48 PM.